[ 01 ] — ENGINEERING RECORD
Engineering first.
The watch is the proof.
DOC RX-SRI-MB-001
- PROGRAM
- SRI Mk.I
- REVISION
- Rev A
- BUILD
- EVT-01
- STATUS
- ACTIVE VALIDATION
Every component serves a purpose.
Every tolerance is deliberate.
Every revision is recorded.
A specification, a tolerance, and an inspection record — that is the entire pitch.
[ 02 ] — IN THE MAKING
From silhouette to pressure test.
PROCESS RX-SRI-PR-005
01
SILHOUETTE
Proportions fixed on paper before any metal is cut.
STAGE 01 // LOGGED
02
BLUEPRINT
Every surface dimensioned. Every tolerance on record.
STAGE 02 // LOGGED
03
CNC MACHINING
316L billet cut to drawing. No decorative operations.
STAGE 03 // LOGGED
04
ASSEMBLY
One bench, one technician, one watch at a time.
STAGE 04 // LOGGED
05
PRESSURE TEST
100M verified per unit. Failure means rework, not shipment.
STAGE 05 // LOGGED
[ 03 ] — ENGINEERING CALLOUTS
Specified. Not decorated.
DWG RX-SRI-002 // EXPLODED VIEW
FIG. 03 — SRI Mk.I EXPLODED ARRANGEMENT
[ SELECT A SPEC TO SEPARATE THE STACK ]
[ 04 ] — THE RAONEX STANDARD
Every watch is inspected.
No exceptions.
QC RX-SRI-QC-010
- ✓PASS
CROWN TORQUE VERIFIED
0.6 N·m ± 0.05
- ✓PASS
PRESSURE TESTED
100M / 10 BAR
- ✓PASS
DUST INSPECTION
CLEANROOM BENCH
- ✓PASS
ASSEMBLY SIGNED
TECHNICIAN ID ON CARD
If it doesn’t pass, it doesn’t ship.
There is no B-stock.
The line is binary: a unit either meets the drawing or it goes back for rework. The inspection card in the box is signed by the technician who built your unit — not printed by marketing.
[ 05 ] — THE MISSION
For Engineers.
Built by Engineers.
No personas. No demographics. One standard: if you trust instruments more than marketing, this watch is for you.
[ 06 ] — DROP 001
300 units. Then the line stops.
BATCH RX-001/300 → RX-300/300
300
UNITS // SERIALISED // NEVER REPEATED
No restock. No reissue. No “back by popular demand”. When the line stops, it stops — the drawing is retired with it.
RESERVE DROP 001 →- SERIAL ENGRAVINGRX-XXX/300, case back
- INSPECTION CARDSigned at the bench, unit-matched
- TECHNICAL MANUALFull spec sheet. Zero marketing.
- MISSION STRAPFitted, spare in the box
[ 07 ] — RESERVE
Reserve
Drop 001.
CHANNEL: SECURE
Leave a signal. We transmit once — when the line opens.
- — EXPRESSION OF INTEREST, NOT A PAYMENT.
- — SHOPIFY CHECKOUT GOES LIVE AT DROP.
- — ONE EMAIL. NO NEWSLETTER. NO DRIP CAMPAIGN.

